Proposed Upper Kaituna Hydroelectric Power Scheme
Scheme OverviewBay of Plenty Energy is an experienced, long-term supplier of energy to the greater Bay of Plenty region from a mixture of hydro, geothermal and natural gas co-generation. Bay of Plenty Energy is:
To maintain a stable electricity supply, Bay of Plenty Energy proposes a small scheme on the Kaituna River well downstream of the Okere Falls and below the Trout Pools (Pararaurekau). There will be no impact on the highly popular recreational areas of Okere Falls and the Trout Pools. It will generate 13.5 MW of electricity - enough to supply around 10,000 homes. The support and long-term commercial partnerships between Bay of Plenty Energy and two iwi landowners - Taheke 8C and Ruahine Kuharua Incorporations - has made this scheme possible. Taheke 8C and Ruahine Kuharua Incorporations own and manage farmland on the eastern side of the Kaituna River which provides access and land for the Scheme's canal, power station and transmission line.
A low-profile weir has been designed to have the least effect on the natural character of the Kaituna River. The proposed Upper Kaituna Hydroelectric Power Scheme (the Scheme) would raise the water depth by approximately 7 metres behind the weir. The current view (left) of the proposed weir site along with a visualisation of the proposed weir structure (right) is pictured above. Proposed Upper Kaituna Hydroelectric Power Scheme LayoutThe Scheme involves building a weir across a gorge section of the Kaituna River approximately 1.2km downstream from the Trout Pools. A small lake (up to ~8 metres deep) forms behind the weir and control gates manage the water flow into a purposebuilt canal (situated on private land). Water travels 2km along the canal before flowing down a penstock and through a power station to generate electricity. All the water is then returned to the river's natural course and the full flow of the river is restored. Electricity generated is fed into the existing local network via a new transmission line. The resource consent process will determine an agreed residual flow in the riverbed and there is no impact on the river downstream of the Scheme.
The Concession ApplicationBay of Plenty Energy applied to the Department of Conservation for a concession to use approximately 0.7 hectares of the 54 hectare Reserve to site the left footprint of the weir and to inundate a narrow strip of the Reserve. The concession was granted in December 2007 A concession is a right granted by the Department of Conservation to use land for a specific purpose. It is essentially a land access right. The concession provides Bay of Plenty Energy with a land access right to use the Reserve for the purpose of hydroelectric generation (the concession activity) for a term of 60 years. The Kaituna River is not part of the Reserve. The impacts of the proposed Scheme on the Kaituna River itself will be addressed as part of the resource consent application process with the Bay of Plenty Regional Council (Environment Bay of Plenty) and the Rotorua District Council. Environmental Impact on the ReserveThe site of the Scheme has been carefully chosen with support and co-operation from the iwi landowners to minimise environmental impact. The Scheme will only affect approximately 0.7 hectares of the 54 hectare Reserve. This area is needed for the left-hand footprint of the weir and for the inundation caused by the rise in water level behind the weir. (See diagram.) Bay of Plenty Energy has carefully considered the effects of the Scheme on the Reserve in its application. The Department of Conservation identified five effects as significant. They include the temporary effects of construction, the location of the weir, changes to vegetation, changes to water levels, and the overall visual impact of the Scheme. Only 1.3% of the 54 hectare Reserve will be impacted and independent expert studies commissioned by Bay of Plenty Energy show this impact to be minimal. Expert evidence shows there are no wahi tapu sites in the area affected by the Scheme. Bay of Plenty Energy will work with the Department of Conservation to minimise the effects of the Scheme and to make improvements to the Reserve as a whole. Bay of Plenty Energy will also work with the Rotorua District Council to support and fund improved access to the Reserve. Improvements could include pest eradication, re-planting and protection of any at-risk native species, as well as improved public access and recreational opportunities. Bay of Plenty Energy's Commitment to Improve the ReserveIn consultation with the Department of Conservation, Bay of Plenty Energy will:
Summary of Benefits
Stakeholder and Public Consultation ProcessesFor several years Bay of Plenty Energy has been talking about the project with individuals and groups representing tangata whenua, river users, environmental and recreational groups, as well as relevant statutory authorities. The feedback received has helped in the preliminary design of the Scheme and in assessing the environmental and regional impacts. Following the granting of the concession in December 2007, Bay of Plenty Energy can now apply for resource consent from the regional council, Environment Bay of Plenty. This will involve full consultation with all interested parties. For further information contact John Smyth, Generation Manager on (07) 306 2700. For information on other new Bay of Plenty Energy and Todd Energy generation projects click here. |
||
![]() | ![]() |
||
|